Contract and delivery time |
car type |
Delivery Quantity |
Demand |
Remarks |
2022 |
October |
Hybrid motor car |
1 |
SG-Rail |
In production |
|
signal motor car |
1 |
|
|
|
Electric motor car |
1 |
|
|
|
Rail transport trolley |
10 |
|
|
|
Reputation Trailer |
2 |
|
|
September |
Rail transport trolley |
10 |
Seoul Metro Line 9 Co., Ltd. |
Delivery |
June |
Hybrid motor car |
5 |
Seoul Transportation Corporation |
In production |
|
Rail transport trolley |
18 |
|
|
|
Reputation Trailer |
12 |
|
|
May |
30TON Orbit Motor Car |
1 |
Seokjeong Construction |
In production |
¡¡ |
¡¡ |
¡¡ |
¡¡ |
¡¡ |
2021 |
April |
High-pressure water cannon 2 (water pump overhaul repair) |
1 |
Seoul Transportation Corporation |
Delivery |
|
|
|
National Railroad Authority |
Delivery |
|
High pressure water cannon for railways |
1 |
Korea Railroad Research Institute |
Delivery |
|
gravel removal equipment design service |
1 |
|
|
¡¡ |
¡¡ |
¡¡ |
¡¡ |
¡¡ |
2020 |
December |
Key parts of vibratory compactor |
1 |
Korea Railroad Research Institute |
Delivery (development project) |
October |
2 way car localization development |
1 |
National Railroad Authority |
In progress (national project) |
¡¡ |
¡¡ |
¡¡ |
¡¡ |
¡¡ |
2019 |
December |
Tow truck |
1 unit |
Korea Railroad Corporation |
|
|
Inspection of motor cars and railway equipment |
22 units |
Seoul Transportation Corporation |
|
¡¡ |
¡¡ |
¡¡ |
¡¡ |
¡¡ |
2018 |
December |
Towing motor car |
1 unit |
Gangchon Rail Park Co., Ltd. |
|
September |
Track lifting vehicle |
1 unit |
Korea Railroad Research Institute (KCWI) |
|
¡¡ |
¡¡ |
¡¡ |
¡¡ |
¡¡ |
2017 |
June |
Tow truck |
2 units |
Korea Railroad Corporation |
|
¡¡ |
¡¡ |
¡¡ |
¡¡ |
¡¡ |
2016 |
October |
Water Tank Trailer for Sprinkling (10,000 liters) |
1 unit |
Incheon Transportation Corporation (Sampyo E&C) |
|
March |
Production and delivery of Techno Drive, a high-pressure water cannon |
1 unit |
Seoul Metro |
|
February |
Improve performance of tracked special vehicles |
6 units |
Seoul Metro |
|
¡¡ |
¡¡ |
¡¡ |
¡¡ |
¡¡ |
2015 |
December |
Special performance check for track and signal vehicles |
18 units |
Seoul Metro |
|
November |
Engine replacement of high pressure water cannon |
1 unit |
Seoul Metro |
967hp/1800rpm |
October |
Development of little train (battery type) |
3-car 1 formation |
- |
|
|
Improvement of brake system for track special vehicles |
18 units |
Seoul Metro |
|
June |
New construction of high-pressure water cannon smoke reduction device |
1 unit |
Seoul Metropolitan Rapid Transit Corporation |
|
February |
appointment of equipment performance evaluation advisory committee members |
- |
Seoul Metro |
Railroad equipment design, production, performance evaluation |
¡¡ |
¡¡ |
¡¡ |
¡¡ |
¡¡ |
2014 |
December |
Development of tow trucks for amusement facilities |
1 unit |
- |
|
June |
Special performance check for track and signal vehicles |
20s |
Seoul Metro |
|
February |
Maglev railway trailer (antenna inspection platform) |
20s |
Incheon International Airport Corporation |
|
¡¡ |
¡¡ |
¡¡ |
¡¡ |
¡¡ |
2013 |
December |
Maglev train motor car |
1 unit |
Incheon International Airport Corporation |
|
October |
Maglev railway trailer (elevating work platform for electric vehicle line inspection) |
1 unit |
Incheon International Airport Corporation |
|